• Post information
  •   
Delhi’s Aerocity Metro station to have longest platform in Phase 4
details

NEW DELHI

A longer platform will help accommodate the anticipated increase in passenger traffic, as station will have a triple interchange facility linking the Airport Express Line, the Silver Line and an RRTS corridor (Gurugram-Manesar-Alwar), DMRC said.

To be sure, among underground stations, the platform of the IGI Airport terminal 1D station on the Magenta Line is the longest at about 312.2 metres, while the Ashram metro station on Pink Line has the smallest platform at 151.6 metres.

The standard length of an underground metro station platform is 225 metres, according to officials.

“The (Aerocity metro) station will come up at a depth of 23 metres to ensure seamless connectivity between the Airport Express Line, the Silver Line, and the RRTS corridor. This station will be a terminal station, which will provide direct connectivity along South Delhi to West Delhi, provide connectivity to Faridabad and provide another link to the Indira Gandhi International Airport,” said Anuj Dayal, principal executive director, corporate communications at DMRC.

Officials aware of the matter said that the work on the station was underway, which is being done using a bottom-up method of construction. The station will have three entry and exit points each — one connecting the business hub of Aerocity and the other two entry and exit points structures will connect the station with NH-8 and the nearby locality of Mahipalpur through a pedestrian subway.

The Tughlakabad-Aerocity corridor under the newly drawn Silver Line will have four elevated and 11 underground stations. The corridor will also have four interchange stations at Aerocity, Chattarpur, Saket and Tughlakabad.

Officials said that the line will help address the increasing transportation demands on the Mehrauli-Badarpur Road, Chhattarpur Extension and Mahipalpur area.

“It will serve as a lifeline for commuters, reducing travel time, and offering a reliable and efficient mode of transportation. The station will help the residents of south Delhi, Faridabad and Noida to travel and reach the airport at a faster speed,” Dayal added.

As part of the Delhi Metro’s Phase 4 expansion, construction work is ongoing at stretches measuring around 65.1km, including the Magenta Line extension from Janakpuri West to RK Ashram Marg (28.92km), Pink Line extension from Majlis Park to Maujpur (12.55km), and the upcoming Silver Line from Tughalakabad to Aerocity (23.62km). The Silver Line will connect the operational Violet and Airport Lines from their respective ends.

Related Updates

Arturo Falaschi Postdoctoral F

Deadline 30-Sep-2023Member State:-ICGEB&

Read more »

HTML Development Internship

Company Name:- Myitronline Global Servic

Read more »

ChatGPT Go Free for 12 Months

 
ChatGPT Go Subscription Now Free

Read more »

If Pant doesn't recover, who w

India is scheduled to play the ODI World

Read more »

All India Engineering Entrance

The All India Engineering Entrance Exami

Read more »

Kind Circle Scholarship for Me

Deadline 31-Mar-2024
Eligibility
Enrol

Read more »

Sandeep Maheshwari

Sandeep Maheshwari is a name among milli

Read more »

Patliputra University, Patna

Patliputra University, Patna was establi

Read more »

Vidyadhan Bihar Plus 2 (1st ye

Deadline:- 30-Jun-2023Destination:-SSLC/

Read more »

Amazon India - "Aur Dikhao"

"Aur Dikhao" is one of the most iconic a

Read more »